Review your needs and contract to strategically tailor a workplan for your Construction Project. Working with your Company and devising a plan ensuring your goals and satisfaction at every step.
Our experienced working with all Team members has brought the "1-Team" idea to the next Level. We bring passion and ownership to every project and evolve through countless delays with a Win.
Proven outcomes that speak for themselves and make a meaningful difference for your business. Growing your entire Team for controlled growth and expanding within for the future projects.

At Buchanan Electric, we specialize in providing strategic advice to optimize your electrical systems and improve overall efficiency. Buchanan Electric is committed to delivering tailored solutions that meet your unique business requirements, ensuring reliability and energy savings. Trust us to guide you through seamless upgrades and energy management strategies that boost productivity and reduce costs.

Implementing effective energy management strategies is vital for reducing costs and environmental impact. Buchanan Electric can provide comprehensive assessments and customized plans that align with your business goals. Buchanan Electric can also help you achieve measurable scheduling savings through innovative solutions in BOD, OFCI/CFCI, Procurement, Job-Site Temp-Power Package, Logistics, Pre-Con, BIM, Constructability, OSM, Pre-Fab, Site Visits/Job-Walks, OAC/Meetings/Teams, QA/QC, CX-Recovery Schedules.
Owner/Consultant
Working directly with Owners, Engineering and Vendors, General Contractors and Sub-Contractors to build what is needed for successful projects/jobs on time and always making the scheduled contractual dates.
Expedite the Building of Super Structure(s) in the current explosion of Data Centers across the USA.
Director of Field Operations
Barber Lake, Black Pearl I & II, Stingray and Ulysees and future projects.
Build the standard Team from the ground up foundation for a new Company to be able to assist and address all areas of construction to fast track a "Playbook" for other Company's. Building CM Teams with Project Controls, Scheduling, BIM, Constructability, Pre-con, MV/Fiber, Prefab, QA/QC, CX.
Work directly with the Owner's Team for devising the basic standards for construction. Expedite the Building of Super Structure(s) in the current explosion of Data Centers across the USA.
General Field Manager
STACK SVY06, SVY05, SVYAD SVYPG DATA CENTER CAMPUS 91 MW
Schedule and Design Assist project with Bim/Constructability Teams. Manage OFCI, CFCI Gen-Yard, CX, Site Campus Loop, Gen-Yards Crane Picks, MV and Fiber Site Packages and 21kv to 34.5kv PG&E Bridging Scope
Superintendent
Amazon AWS CMH - Industrial Parkway Campus
8619 Industrial Parkway
43064 Plain City
Ohio, USA
Superintendent
SFO-061 Phase 1-9 AWS "Snowflake" Campus Clawiter Road Hayward, CA 278,500 square foot building with 49 MW of IT space and an administration building.
Superintendent
Building 3, 5 & 6 New Albany International
Business Park. NAO is a 345-Acre site and Campus
powered by 100 percent renewable energy.
Superintendent with MC/HC
Superintendent
Kaiser(s) Hospital 700 Lawerence Expressway, Santa Clara, Ca 95051.
Stanford Hospital 500 Pasteur Drive, Palo Alto, Ca 94304.
Marin Health Medical Center 250 Bon Air Road Greenbrae, Ca 94900.
Worked with all Hospitals during the COVID-19 Pandemic, setting up remote CT scan, MRIs and temp power for Semi-Trailers for
deceased. "Essential Workers" were individuals deemed necessary to keep critical functions of society running, during lockdowns and restrictions.
Superintendent
150 West Hedding Street San Jose, Ca. Plans and Specs 5 mil design assist for Main Jail. In
stall new design build for 12kv through Campus. Demo old Jail and convert 12KV
system and added MSB's with (2) 2 Meg Generators and a House 1
Meg Generator, Load Bank, 3000a ESB for entire Jail and facility.
Superintendent
Plans and Specs 14 mil of Parking Garage and Administration Building. Change Orders for Day II on Main Hospital for Stanford Direct. Small projects for Completion of Building with McCarthy and Stanford PM Team's. Complete Design assist for Bucky Ball, Gift Shop, Kitchen/Café(s), Flower Shops and Restaurant.
Superintendent
Apple Inc.1 Apple Park Way Cupertino, Ca 95014
Design Build 1.9 mil for the APPLE PM Garage CUP Office and assist in the Design Build 7.2 mil for the Wellness Fitness Center. Design assist Lutron Site Lighting throughout the entire Campus of 170+ acres with ISP. Design assist over 28.8 mil T&M on entire campus for over 250,000 man hours working directly for HOLDER/TRUEBECK and APPLE direct without any recordable injuries. Plans & Specs/Design assist 2.9 mil Steve Jobs Theater. Install and commission the entire Site Lighting Campus systems and add all Day II scopes for Apple Direct. Schedule and work directly on TCO and CO for entire Campus with General Contractors and Owners Rep's with Cupertino Inspections and State Inspectors.
Superintendent
Tesla Milpitas Plant 640 Barber Lane, Milpitas, Ca 95035
Design Assist over 2.8 mil T&M and Design Build and work with Owner's engineering Teams. Schedule and assist multiple crews overtime shift(s) and scheming the LOTO plans and MOPs for Buildings cut overs. Coordination with MEP's and walking with onsite Inspections and owners reps.
Superintendent
Oakland Port Authority
Superintendent
Project description Uptown Station is a 400,000 square foot remodel of the 1928 Sears Building which will create a new headquarters for UBER in the East Bay with additional retail/mixed-use space for the Oakland downtown business park. This project will have a new 12KV service (12KV substation and transformer), four 3000A substations, a 1250KW Generator, Warm Shell and TI build-out , and wireless lighting control system. "
General Field Manager
HGST A1 185,000 square footage
Administration Building, Design/Install of Entire Building, 12KV 4000amp 1 Line, HVAC, Fire Alarm, Security, Elevators, Power & Lighting System Controlled by Lutron System, WAP, PV System.
Medium Voltage 12kv System and addition to Main Campus from Substation
Campus Site Lighting
Change Orders on Campus
Building 109 Amenities
General Field Manager
100 Mayfield Ave. Mountain View, Ca 94043 $45.5 mil design build.
Lighting Design Entire Main Building, Café, and Amenities Building
Coordination-Tracking-Schedule-Commissioning Fire Alarm, HVAC, Café, Lighting, Elevator's
Inspection Finals: State Elevator Inspection, Health Department, Mountain View Fire Department, City of Mountain View
General Field Manager
$100 bil design build, a 1.5 mil square foot NFL Stadium 12KV primary w/switchgear with automatic throw-over scheme, four double ended and four radial substations, museum, concessions, and network television infrastructure.
100 Level Overall Underground of Entire Project, Legacy Clubs, Locker Rooms, Jail, Cooling Tower, Generators, Substations, Electrical/Comm/Fire Alarm/Sec/Fire Command/Pump Rooms/Mechanical Rooms/49er's Operations Office.
General Field Manager
100 Mayfield Ave. Mountain View, Ca 94043 $45.5 mil design build, three story building 110,000 square foot, parking garage and 2 story building along with fitness center.
General Field Manager
555 Reed Street. Santa Clara, Ca 95050.
$62.5 mil design build, 360,000 square feet, w/ 176,200 of raised floor. The 1st Phase N=2 redundancy consists of computer rooms with Server Racks host (240) CRAC units with redundant looped chilled water throughout and (16) 2.25 MW Generators to maintain continuous uptime with a 8,000-ton central plant.
Superintendent
Superintendent
Superintendent